Seawater Pipeline


Whole (8)  |  GRP & HDPE PIPE  |  Concrete Box Culvert  | 
TOTAL 8
1) Set the bogies under the base
2) Move the base to the caisson manufacturing place
3) Move the bogies to a finished caisson
4) Set the caisson on the floating dock
SEAWATER PIPELINE(Concrete Box Culvert)